Does Brexit change how Annex 11 applies to UK computerised systems?
Brexit did not remove Annex 11 from UK practice. The UK GMP framework retained the EU GMP guidelines, including Annex 11 on computerised systems, so MHRA inspectors still expect risk management, validation, audit trails, security and electronic-signature controls on GxP systems. Differences may emerge over time because EU revisions, such as the July 2025 draft of a new Annex 11, do not automatically become UK requirements. Zecadd tracks both the UK position and the EU draft for British clients that supply the EU market, since a manufacturer exporting to Europe often needs to satisfy both inspectorates. In practice, a UK site's SOP system should be validated against the current UK text, with a documented assessment of any later EU changes it chooses to adopt.